WAL crane reaches up and over the ‘wall’ January 15, 2014January 15, 2014 MM Setting upper level formwork for the concrete stair at the wall required a special crane with a LONG reach – worked right over the top of the six story building to avoid the powerlines in the alley. Photo thanks to Dave Andrews of Largo Concrete