WAL crane reaches up and over the ‘wall’

Setting upper level formwork for the concrete stair at the wall required a special crane with a LONG reach – worked right over the top of the six story building to avoid the powerlines in the alley. Photo thanks to Dave Andrews of Largo Concrete

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.