Applied Architecture / Michael F. Malinowski AIA Architect of the WAL Warehouse Artists Lofts featured during AIA Central Valley Architectural Festival
Category: WAL
WAL Public Market designed by MFMalinowski AIA to open soon
The Warehouse Artist Loft Public Market, designed by Architect Michael F. Malinowski AIA as part of the WAL project, is set to open soon, continuing the revitalization of R Street!
at the WAL with Dino
First Tenants at the WAL
Tour of the WAL
Three different Sacramento State Design instructors are using the WAL as a platform for their student projects this semester. I’m leading a group through the site to provide some background on Wed this week; starting at 9:30 on the loading dock.
catalyzing R Street the WAL
Architect: Michael F. Malinowski AIA / Applied Architecture Inc 2015-Jan-Comstock.pdf
Planners at the WAL
The California Planning Roundtable – a group of thought leaders in the realm of urban planning from around the state – had a full day conference at the WAL . Ali Youseffi and I were pleased to lead them on a tour and provide some background on this Historic Adaptive Reuse – which certainly has the seeds of the kind of kick start revitalization that is a driver in the future of all the cities in the US Michael F. Malinowski AIA President, Applied Architecture Inc 2015-2016 AIACC 1st VP/President Elect 2012-2014 AIA National Director 2009-2010 AIACC Vice President Communications/Public Affairs 2008 President American Institute of Architects Central Valley 2007 Chair, Development Oversight Commission, City of Sacramento
Art at the WAL
the WAL is Open
Applied Architecture / Michael F. Malinowski AIA’s Warehouse Artist Lofts are now being occupied by artistic tenants daily . 300+ who camped out overnight to get at the head of the line. CFY is the project developer and GC
More Drama at the WAL
From art to places on the roof to grow your own vegetables . details at the WAL continue to fall into place
Special Places at the WAL
Special spaces and places taking shape at the WAL
WAL Certificate of Occupancy Approvals
City approvals on the WAL project are in hand as of today. Now it’s just a matter of mopping up some details in “fit and finish”.